Flour production plants, mill buildings: Batiment-1 and Batiment-2, Sonoco Conakry


2012-2013, Conakry, GN
  • Investor

Batco Conakry, Gwinea

  • Architect/Employer

Batco Engineering Conakry

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description:

Three-piece mill buildings: Batiment-1 and Batiment-2 for flour production plants: Sonoco Conakry.
Scope of work:
Project and construction of the mill buildings: Batiment-1 and Batiment-2 in a steel structure.
Realizacion:
Conceptual-technology project of the mill buildings: Batiment-1 and Batiment-2; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, project and fabrication of the facade and roof, and transport to Conakry, montage of facades and roof.

 


Silos for grain Sonoco Conakry


2012-2013, Conakry, GN
  • Investor

Sonoco Conakry, Gwine

  • Employer/Architect

Batco Engineering Conakry

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description

Twelve rectangular steel silos; dimentions: 3.85×3.85m i h=7.5m.
Scope of work:
Project and construction of twelve rectangular steel silos for grain – Mill buildings Sonoco.
Realization:
Conceptual-technology project of silos for mill buildings: Batiment-1 and Batiment-2; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, transport to Conakry.


Silos for flour Sonoco Conakry


2012-2013, Conakry, GN
  • Investor

Sonoco Conakry, Gwine

  • Employer/Architect

Batco Engineering Conakry

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description

Six round steel silos; dimentions: d=2.8m i h=9.8m.
Scope of work:
Project and construction of six round steel silos for flour – Mill buildings Sonoco.
Realization:
Conceptual-technology project of silos for mill buildings: Batiment-1 and Batiment-2; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, transport to Conakry.


Extension of Batco factories – Atelier des armatures


2012-2013, Conakry, GN
  • Investor

Batco Conakry, Gwinea

  • Architect/Employer

Batco Engineering Conakry, BMS Entzheim, F

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description

The production hall of structural elements for the company Batco, Conakry.
Scope of work:
Project and construction of a production hall – ‘Atelier des armatures’ in a steel structure.
Realizacion:
Conceptual-technology project of the production hall building; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, project and fabrication of the facade and roof, and transport to Conakry, montage of facades and roof.


Hangar for airplane A380 ‘Wide Wide Body’


2008, Euroairport
Basel-Mulhause
  • Investor

Jet Aviation, Basel, CH

  • Architect/Employer

Losinger S.A., Basel

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project
- technical documentation
- manufacture of construction in PL
- transport and assembly in France

  • Project description

Hangar ‘Wide Wide Body’ has been developed for the assembling of the Airbus A380 for special clients and his later maintenance. It was planed to be assemble from parts procuced in different Airbus plants aroung France. The hangar main hall has dimensions A=100.0m, B=110.0m H=33.0m. The main hall is cased with srvice and office buildings.
Scope of work:
Execution project of steel structure of the main hall (Hangar is located on a seismic ground). Fabrication of the steel structer and their transport to Euroairport. Assembling of the steel structure.
Realizacion:
Execution project of steel structure included detail design, connection check and workshop drawing according to french standards. Fabrication of the steel structure has been done in Poland and in Germany. The main supporting elements and profiles has been produced from welded cross-sections produced by huta Pokoj in Poland. The steel structure include roof structure, fasades, entrence gateway, workshop crane, working platforms, fire protection cutains, passarels and stairs. Transportation by car from production plants to the Euroairport. The roof was entirely assembled on the ground slab and erected by hydraulic devices manipulate by specialists from VSL Company.
 


Production facilities ‘Rolls Royce Marine’


2009-2010, Gniew, PL
  • Investor

Rolls Royce Marine

  • Architect/Employer

ISG Europe

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- reconstruction and expansion of production facilities
- site work execution scheme
- construction supervision

  • Project description

The modernization and expansion of the Rolls Royce Marine factory in Gniew.
Scope of work:
The modernization of the production hall, construction of a new coating workshop, adaptation and transportation system expansion of the plant.
Realizacion:
Execute project of steel, concrete and bricks structure; accompanying media projects. Exchange and strengthening the existing hall steel elements; new block foundation for machines, industrial floor, complete construction of the new coating workshop, the modernization of the facade and the illumination of coating workshop; heating and ventilation system, the necessary repair work (painting, corrosion protection, replacement of windows).


EKO-Hotel, Conference Center


2008-2009, LAGOS, NI
  • Investor

ITB Engineering Ltd.

  • Employer/Architect

ITB Engineering Ltd.

  • Realization/Structure

- Ing.-Büro Z.Sacharuk Ltd.
- Polswiss-Projekt Ltd, Wroclaw

  • Project scope

- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Lagos

  • Project description

Conference center of the hotel “EKO Hotel Lagos’. Building based on eliptical projection ; height15m; length 150m, width 50m
Scope of work:
Execution project of steel structure roof and suspension structures of separating moving walls.
Realization:
Design calculations, workshop drawings, fabrication of steel structure in the PL, road transport and shipping in Lagos. Assembly in Lagos.

 


Espacité Tower


1994, La Chaux de
Fond, CH
  • Investor

Investment – La Chaux de Fond

  • Employer/Architect

Jacques Richter and Ignacio Dahl Rocha, Lausanne; Jakam AG

  • Realization/Structure

Ingenieurbüro Z.Sacharuk GmbH

  • Project scop

- execution project

  • Project description

Office building in reinforced concrete and steel, stair and lift communication shafts; the round part standing on poles; 14 stories; hight: 60m.
Scope of work:
Steel structure execution project.
Realization:
Steel columns supporting facade, circular composited slabs with steel beams spaced radially with circular keystone in the middle; steel construction of 14-stories staircase.

 


Entertainment tent for ‘TV VIVA’


1999, KÖLN, DE
  • Investor

TV VIVA

  • Employer/Architect

Sobolta, Köln

  • Realization/Structure

Poloswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- execution project
- workshop and assembly project
- transportation of construction to Köln

no photo gallery

  • Project description

The steel structure of entertaiment tent for television, including coverage of airbags. Usable area: 1500m2; capacity: 8000m3.
Scope of work:
Fabrication of steel load-bearing structure.
Realization:
Execution and workshop project, supervision and control of component’s fabricatio; transportation to Köln.


Cable stayed bridge for highway A281


2004-2005, Bremen, DE
  • Investor

ARGE Schrägseilbrücke, Brema, DE

  • Architect/Employer

ARGE Schrägseilbrücke

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- execution project

    • Project decsription

Geometry: -Los A ca 480 m -Los C ca 370 m -Steel structure ca 5`000.ton
Scope of work:
Execution project (steel and reinforcement concrete structures)
Realization:
Workshops drawings of steel structure (Part A, Part C):
- formwork and reinforcement drawings for concrete roadway
- list of material; material order
- erection work organization scheme.
 


Cement Plant ‘Yamaver 5′


2006-2007, Riyadh, SA
  • Investor

YAMAMA Saudi Cement Company YSCC, SA

  • Architect/Employer

Krupp Polysius AG

  • Realization/Structure

- Neu Beckum, Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- construction supervision
- quality control

  • Project description

Raw material supply system, crumble work, silos of raw materials, mill of Raw materials, rotating furnace, calcinations tower, clinker cooling system, clinker mills, clinker silos, transportation system, loading station.
Task:
Erection of the New Clinker Grinding Plant and New Clinker Production Line No. 7 with capacity of 10’000 ton per day. Consulting and supervision of the erection of concrete structures and steelwork for the extension of Cement plant YAMAVER-5 at Riyadh, Saudi Arabian.
Solution:
Assistance and advising of the Technical Manger in all matters related to the civil and structural steel work, Organisation and conducting of the necessary correspondence, Observation of construction and structural steel erection works, Clarification of discrepancies, Recording of all required modifications and indication of reasons thereof, Review of the time schedule, co-ordination of alterations and reporting cause and responsibilities for delays to POLYSIUS, Review of GAMA’s assessment and reporting of the monthly progress for civil works, structural steel deliveries and structural steel erection, Recording, assessment and reporting of any faults in POLYSIUS’s drawings and documents, Participation in technical discussions with YSCC as far as technical matters and time scheduling of the civil and structural steel engineering design and work is concerned and other duties in connection with the realisation of this project for which the Liaison Engineer has the qualification and ability.


Cement Plant ‘Eastver’


2005-2007
Khursaniyah, SA

  • Investor

Eastern Province Cement Company EPCC, SA

  • Employer/Architect

Krupp Polysius AG

  • Realization/Structure

- Neu Beckum, Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- site supervision
- quality control

  • Project description

Raw material supply system, crumble work, silos of raw materials, mill of Raw materials, rotating furnace, calcinations tower, clinker cooling system, clinker mills, clinker silos, transportation system, loading station
Task:
Erection of the New Clinker Production Line No. 3 with capacity of 3’500 ton per day. Consulting and supervision of the erection of concrete structures and steelwork for the extension of Cement plant EASTVER at Khursaniyah, Eastern Province, Saudi Arabian
Solution:
Assistance and advising of the Technical Manger in all matters related to the civil and structural steel work, Organisation and conducting of the necessary correspondence, Observation of construction and structural steel erection works, Clarification of discrepancies, Recording of all required modifications and indication of reasons thereof, Review of the time schedule, co-ordination of alterations and reporting cause and responsibilities for delays to POLYSIUS, Review of GAMA’s assessment and reporting of the monthly progress for civil works, structural steel deliveries and structural steel erection, Recording, assessment and reporting of any faults in POLYSIUS’s drawings and documents, Participation in technical discussions with EPCC as far as technical matters and time scheduling of the civil and structural steel engineering design and work is concerned and other duties in connection with the realisation of this project for which the Liaison Engineer has the qualification and ability.


Steel plant Swiss Steel ‘Von Moos’


2007-2008
Emmenbrücken, CH
  • Investor

Swiss-steel AG, Emmenbrücken, CH

  • Architect/Employer

Concast AG

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

steel supporting structure
- static analysis
- dimensioning
- workshop drawing

  • Project description

Multi-level steel structure supporting the machines and working platforms; system of vertical communication.
Scope of work:
Project of steel structures for technological equipment.
Realization:
Conceptual and execution project, static and dynamic analysis; engineering and workshop drawings of steel structure.


Steel plant ‘Riva Caronno’


2007, IT
  • Investor

Gruppo Riva, Carono, IT

  • Employer/Architect

Concast AG, Zürich

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- static analysis
- dimensioning
- workshop drawing

  • Project description

Multi-level steel structure supporting the machines and working platforms; system of vertical communication.
Scope of work:
Project of steel structures for technological equipment.
Realization:
Conceptual and execution project, static and dynamic analysis; engineering and workshop drawings of steel structure.


Steel plant ‘Huta Warszawa ARCELOR’


2006, Warszawa, PL
  • Investor

Arcelor-Mittal

  • Employer/Architect

Huta Warszawa, Arcelor-Mittal

  • Realization/Structure

Polswiss-Projekt Ltd., Wroclaw

  • Project scope

- site work execution scheme
- construction supervision

  • Project description

Adaptation of steel billets cooling region.
Scope of work:
Project of steel structures for technological equipment and reinforced concrete supporting structure.
Realization:
Conceptual and execution project, static and dynamic analysis; engineering and workshop drawings of steel structure; formwork and reinforcement drawings of reinforced concrete. Steel construction contractor: Hale Stalowe Ltd.


Steel plant ‘Ascometal, Usine des Dunes’


2007-2008
Dunkierque, FR
  • Investor

Ascometal, Dunkierque, F

  • Employer/Architect

Concast AG

  • Realization/Structure

Concast AG, Ingenieurbüro Z.Sacharuk Ltd.

  • Project scope

steel supporting structure
- static analysis
- dimensioning
- workshop drawing

  • Project description

Multi-level steel structure supporting the machines and working platform; system of vertical communication.
Scope of work:
Inventory of existing steel casting production line; steel construction project for a new steel casting line.
Realization:
Conceptual and execution project, static and dynamic analysis; engineering and workshop drawings of steel structure.


Production plant for pipe and pipe fitting elements of plastic, FUNKE Polska Ltd


1999-2000
Kondratowice, PL
  • Investor

Funke Polska Sp. z o.o.

  • Architect/Employer

- Impresio Sp. z o.o.
- Funke Polska Sp. z o.o.

  • Realization/Structure

Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- general designer
- construction supervision

  • Project description

Usable area: 3500,0 m2 Building area: 3000,0 m2 Cubage: 20000,0 m3
Scope of work:
Erection of a new factory for plastic pipe and pipe fitting elements including: production hall, administration building, storage hall, transforming station, silos, roads, parking, storage areas, water reservoir
Solution:
Complete, multi branch planning, design and erection of production plant. Branch projects: disassembling project for existing buildings, architecture, structure, air condition, sanitary and electrical installations, hitting system, environmental protection structures and measures, concrete roads, parking and storage areas and permission of utilization


Industry hall for storage and production – CYNKMAL


1999-2000, Legnica, PL
  • Investor

Cynkmal Sp. z o.o., Legnica, PL

  • Architect/Employer

Cynkmal Sp. z o.o., Legnica, PL

  • Realization/Structure

Polswiss-Projekt Sp. z o.o. Wroclaw

  • Project scope

- design and construction permission
- execution project
- site supervision

  • Project description

Usable area: ca 500 m2 Building area: ca 500 m2 Cubage: ca 2000 m3
Scope of work:
Development of Hall System; Complex project of industrial building /industrial hall/, site supervision
Realizacion:
Hall supporting structure made from light gauge profiled steel sheeting, Multilayer lining inclusive windows and gates, foundation and concrete plate. New Hall system.

 


Extension of the FAEL-LEGRAND Production Plant


1998-1999
Zabkowice Sl., PL
  • Investor

FAEL-Legrand, Zabkowice Sl., PL

  • Architect/Employer

- Impresio Sp. z o.o.
- FAEL-Legrand

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wrocław

  • Project scope

- execution project
- building design
- construction supervision

  • Project description

Usable area: 8500,0 m2 Building area: 7500,0 m2 Cubage: 80000,0 m3
Scope of work:
Multistorage werehouse hall for electrical materials, roads & places, water pump station and accompanying infrastructure. Technicl documentation contained: architecture, structure, air condition, sanitary and electrical installations, fire protection.
Realizacion:
Planning & design stages:
- technical doc. for building permission
- execution project
- coordination & selection of subcontractors for building , roads and squeres design and for execution works.