PROJEKTY W BUDOWNICTWIE

COMMERCIAL CONSTRUCTION

HOTELS AND CONFERENCE CENTERS
OFFICE BUILDINGS
SHOPING CENTERS
GARAGES AND CAR-PARKS
CONSTRUCTION FOR
EDUCATION
HOUSING CONSTRUCTION
OTHER PUBLIC
FACILITIES

INDUSTRIAL
BUILDING

CEMENT PLANTS
STEEL PLANST
FACTORIES
HALLS AND HANGARS
SILOS

OTHER INDUSTRIAL
FACILITIES

CIVIL ENGINEERING

BRIDGES AND FOOTBRIDGES
TUNELS
OTHER ENGINNERING
FACILITIES


Hotel Campanile – Premiere Classe


2008-2010, Wrocław, PL
  • Investor

Warimpex; Starwood Capital Group

  • Architect/Employer

Impressio Sp. z o.o., Wroclaw;

  • Realization/Structure

Polswiss-Projekt Sp. z o.o. Wroclaw

  • Project scope

- execution project
- design and construction permission

  • Project description

Hotel complex: containing two-wing hotel building, garden and parking area for 130 cars. The surface of construction plot has 1.4 ha.
Hotel complex contain: two stars ‘Campanile Hotel’ and one star ‘Premiere Classes Hotel ‘. Both buildings adjoin to each other by common wall. The building is fife stories high. There are reception, conference rooms, bar and restaurant in the ground floor; on the other four stories there are 288 guest rooms.
Scope of work:
Supporting structure design.
Realization:
The main supporting structure is built of reinforced concrete structure (foundation plate, columns, beams, walls, stair cages, lift shafts, slabs (16cm thick). The small roofs of lift shafts and stair cages as well as over the entrance are realized as a steel structure.

 


Hotel Radisson


1999-2001, Wrocław, PL
  • Investor

Radisson Polska

  • Employer/Architect

Impressio Sp. z o.o., Wroclaw

  • Realization/Structure

- Ing.-Büro Z.Sacharuk Ltd.
- Polswiss-Projekt Sp. z o.o., Wroclaw

  • Scope of work

- execution project
- design and construction permission
- site supervision

  • Project description

Hotel complex: containing two-wing hotel building, internal courtyard and the 2-stories underground parking house.
Hotel complex contain: four stars ‘Radisson Hotel’. Both buildings wings adjoin to each other by common wall. The building is seven stories high. There are reception, conference rooms, bar and restaurant in the ground floor; on the other six floors the guest rooms are located.
Scope of work:
Supporting structure design.
Realization:
The main supporting structure is built of reinforced concrete elements (foundation plate repose on the grating of bored piles), columns, beams, walls, stair cages, lift shafts, slabs (20cm thick). The small roofs for lift shafts and stair cages as well as over the entrance and roof store are realized as a steel structure.


Hotel Holiday Inn Express


2008, Rümlang, CH
  • Investor

Holiday Inn Express

  • Employer/Architect

EBP AG Zürich, CH

  • Realization/Structure

- Ing.-Büro Z.Sacharuk Ltd.
- Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- execution project
- site supervision

  • Project description

Hotel complex: containing three-wing hotel building, internal courtyard with main entrance and the 2-stories underground parking house.
Hotel complex contain: four stars ‘Holiday Inn Express Hotel’. The building wings adjoin to each other by common wall. The building is six stories high. There are reception, conference rooms, bar and restaurant in the ground floor; on the other five floors the guest rooms are located.
Scope of work:
Supporting structure design.
Realization:
The main supporting structure is built of reinforced concrete elements; foundation plate and the sub ground construction of the parking form a rigid case; columns, beams, walls, stair cages, lift shafts and slabs (20cm thick). The small roofs for lift shafts and stair cages as well as over the entrance and the facade suspension construction are realized as a steel structure.

 


Hotel Delta Sherbrooke


1989, Sherbrooke, Ca
  • Investor

Delta Sherbrooke

  • Employer/Architect

SM Group, CA

  • Realization/Structure

Inz. Zb.Sacharuk

  • Project scope
  • - building design
    - execution project
    - construction supervision

  • Project description

Multi-service conference and serviice center, including 11-storied building of the hotel ‘Delta’, and 7-storied office-banking building and service and shopping center.
Scope of work:
Design and execution project of bearing structure.
Realization:
Executive documentation of reinforced concrete structure, skeletal-plate hotel and office-banking building; 2-storied underground car-park; steel-reinforced concrete construction of congress halls and a service and shopping center.

 


Commerce-Office building ‘Odra Tower’


2010-2011, Wroclaw, PL
  • Investor

Gant Sp. z o.o., Wroclaw

  • Architect/Employer

Walas Arch., BARIN Sp. z o.o., Wroclaw

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o. Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- design and construction permission
- execution project
- site supervision

  • Project description

Reinforced concrete office building; 2-stories underground parking house; 16 office and residential stories; Usable area 50 000m2, height 62m.
Scope of work:
Supporting structure design.
Realization:
Design of reinforced concrete load-bearing structure of the building in two phases: design and construction permission, execution project.
- Foundations: fundation on piles, diaphragm walls technology for load-bearing exterior walls of the building
- Carrying system: reinforced concrete skeleton, consisting of shafts and stair shafts, columns, beams and substrings, slabs and reinforced concrete shear walls.

 


Office building ‘Jacob birghart House’


2002, Basel, CH
  • Investor

I.B.O. Development AG, Zug

  • Employer/Architect

Zwimpfer Partner Architekten, WMM AG, Basel

  • Realization/Structure

Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project

  • Project description

Reinforced concrete building in the shape of a comb; 6 floors; 2-stories underground parking house; public transport route for pedestrian and bicycles; total length: 210m; width: 45m.
Scope of work:
Load-bearing structure design.
Realization:
Design of reinforced concrete load-bearing structure of the building in the executive phase.
- foundation plate and reinforced concrete box on the garage
- carrier system: reinforced concrete skeleton, consisting of stair and lift shafts, columns, beams and substrings, reinforced concrete slabs and prestressed slabs.

 


Multi-storey car park ‘Woldi-Wilson Garage’


2006, Strasbourg, FR
  • Investor

Strasburg

  • Architect/Employer

Bifinger Berger GmbH. Freiburg

  • Realization/Structure

Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project

  • Project description

Multi-storey car park at the main train station in Strasbourg.
Scope of work:
Execution project of reinforced concrete load-bearing structure.
Realization:
Static calculations of details; shuttering and reinforcement drawings.


Underground car park WSJ-209 ‘Novartis’


2005-2006, Basel, CH
  • Investor

NOVARTIS AG, Zürich

  • Architect/Employer

EBP+Partner AG, Zürich

  • Realization/Structure

EBP+Partner AG, Zürich; Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project
- reinforced concete construction

  • Project description

2-stories underground car park for 2000 cars.
Scope of work:
Execution project of reinforced concrete structure.
Realization:
Executive documentation of reinforced concrete structure. Reinforced concrete walls, steel columns of solid section. Foundation plate and reinforced concrete slabs. Reinforced concrete staircases and ramps.

 


Espacité Tower


1994, La Chaux de
Fond, CH
  • Investor

Investment – La Chaux de Fond

  • Employer/Architect

Jacques Richter and Ignacio Dahl Rocha, Lausanne; Jakam AG

  • Realization/Structure

Ingenieurbüro Z.Sacharuk GmbH

  • Project scop

- execution project

  • Project description

Office building in reinforced concrete and steel, stair and lift communication shafts; the round part standing on poles; 14 stories; hight: 60m.
Scope of work:
Steel structure execution project.
Realization:
Steel columns supporting facade, circular composited slabs with steel beams spaced radially with circular keystone in the middle; steel construction of 14-stories staircase.

 


Shopping center ‘Kaufland’


2000-2001, Legnica, PL
  • Investor

Kaufland Polska, Wroclaw, PL

  • Architect/Employer

Immpresio sp. z o.o., Wroclaw

  • Realization/Structure

Polswiss-Projekt Ltd., Wroclaw

  • Project scope

- site work execution scheme
- construction supervision

  • Project description

Useable area: 6 500m2 Building area: 5 500m2 Cubage: 40 000m3
Scope of work:
Building structure : shopping center, power node.
Realization:
Reinforced concrete frame construction and prestressed girder hall (System HAHO). External walls made with sandwich panel. Outside part: entrance roof and advertising rack in steel construction. Part of second floor (office level) in reinforced concrete construction.

 


Shopping center ‘Szalony Max’


2001, Walbrzych, PL
  • Investor

PRP Sp. z o.o.,Wroclaw, PL

  • Employer/Architect

Borys Pudelewicz

  • Realization/Structure

Polswiss-Projekt Ltd., Wroclaw

  • Project scope

- design and construction permission
- execution project
- site supervision

  • Project description

Usable area: 6 500m2 Building area: 2 500m2 Cubage: 2 000m3
Scope of work:
Project of supporting structure (foundation, steel and reinforcement concrete structures, wooden structures) including building permit and execution documentation.
Realization:
Static calculation and CAD drawings for – Concrete-frame supported structure (formwork and reinforcement drawings) – Steel structure for shopping hall with roof parking, stair and lift cases (shop drawings and erection project) – Wooden structure of roof girders Site supervision.


‘Entrance North’ Fair building in Messe Basel Plus


1998, Basel, CH
  • Investor

Messe Basel Plus, Bazylea, CH

  • Employer/Architect

Gruner AG, Basel

  • Realization/Structure

Ingenieurbüro Z.Sacharuk Ltd.

  • Project scope

- site work execution scheme
- building design
- reinforced concete bearing structure

  • Project description

Usable area: 3 500m2 Building area: 1 200m2 Cubage: 24 000m3
Scope of work:
Entrance building, design of the whole supporting structure, Documentation for building permit, execution project
Realization:
Design of support system, static & dynamic calculation, layout plans, -execution documentation: Reinforced concrete, steel and complex structure of principal building -Steel construction of entry tower shafts and stair cages as well as over the entrance and roof store are realized as a steel structure.


Medical Science Information Center – Medical University


2008, Wroclaw, PL
  • Investor

Medical University, Wroclaw

  • Architect/Employer

- Heinle Wischer Partner GbR, Dresden
- Akademia Medyczna, Wroclaw

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow
- Ingenieurbüro Z.Sacharuk GmbH, Münchenstein

  • Project scope

- competition project (first place)
- design and construction permission
- execution project

  • Project description

Usable area: 15 500m2, location: intersection of Mikulicz st. and Marcinkowski st.
The library building in reinforced concrete – wet cast; pre-stressed slabs and beams; one level of underground garages. Lecture and seminar rooms, a large conference room and a library.
Scope of work:
Comprehensive structural design of the building.
Realization:
Design of reinforced concrete load-bearing structure of the building in three phases: competition project, design and construction permission
and execution project.
Foundations – foundation slab, partly reinforced with jet-grounding piles;
Carrier system: reinforced concrete skeleton, consisting of lift and stair shafts, columns, beams and stiffeners; reinforced concrete and pre-stressed slabs and walls.
Special design: suspended reinforced concrete slabs; steel structures supporting the central air-conditioning system.


Library of science; Wroclaw University of Technology


2007, Wroclaw, PL
  • Investor

University of Technology, Wrocław

  • Employer/Architect

Heinle Wischer Partner GbR, Dresden / Wroclaw University of Technology

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow
- Ingenieurbüro Z.Sacharuk GmbH, Münchenstein

  • Project scope

- competition project (first place)
- design and construction permission
- execution project
- site supervision

  • Project description

Usable area: 14 000m2; Location: Grunwald Square, the main campus of Wroclaw University of Technology
Three-membered building (coupler between buildings D1 and D2) with passing under central part; one level underground garage.
Building Features: Regional science center, Wroclaw University of Technology library, administration and representation space.
Scope of work:
Comprehensive structural design of the building.
Realization:
Design of reinforced concrete load-bearing structure of the building in three phases: competition project, design and construction permission
and execution project.
Foundations – foundation slab, partly reinforced with jet-grounding piles;
Adjacent building protection project, construction of bus bypass for Thermal Engineering main line;
Carrier system: reinforced concrete skeleton, consisting of lift and stair shafts, columns, beams and stiffeners; reinforced concrete slabs and walls.
Special design: suspended reinforced concrete slabs; steel stairs; construction of passage under part B; steel structures supporting the central air-conditioning system.


Building B-4, Department of Mechanical Engineering and Management – University of Technology


2000, Wroclaw, PL
  • Investor

University of Technology, Wroclaw

  • Employer/Architect

Universiti of Technology of Wroclaw

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw (general designer)
- Polswiss-Engineering Sp. z o.o., Kraków
- Ingenieurbüro Z.Sacharuk GmbH, Münchenstein

  • Project scope

- competition project with architectural office WW-Projekt (first place)
- building design
- execution project
- construction supervision

  • Project description

Usable area: 1 2000m2; Building area: 3 500m2 Cubage: 50 000m3
Scope of work:
Construction of a new Building B-4 including: lecture, conference and computer rooms, library, professor and university teacher rooms, laboratories, cafeteria, restaurants, cloakrooms, underground parking, storage rooms, foyer, porter’s lodge, lifts, stairs, showrooms, etc. 1-Award in architecture competition containing: Building and engineering design.
Realization:
Complete 2-stage project (Building permission and complete execution project) including architecture, structure, air condition, sanitary & electric installations, power engineering, central heating, wiring system, house drainage, roads and squares etc., and site supervision. Cost estimation, selection of contractor, technical acceptance, quality control and work supervision.


Hospital ‘Nouveau Hospital Civil NHC’


2003-2004
Strasbourg, FR
  • Investor

Strasburg

  • Architect/Employer

Claude Vasconi Architect Paris, Hoch-Tief AG, Freiburg

  • Realization/Structure

Ingenieurbüro Z.Sacharuk Ltd.

  • Project scope

- execution project

  • Project description

Public Hospital of Strasbourg, usable area: 80 000m2, helicopter landing pad on the roof.
Scope of work:
Execution project of reinforced concrete load-bearing structure. The facade of prefabricated elements.
Realization:
Static calculations of details; formwork and reinforcement drawings, material lists.


Cable stayed bridge for highway A281


2004-2005, Bremen, DE
  • Investor

ARGE Schrägseilbrücke, Brema, DE

  • Architect/Employer

ARGE Schrägseilbrücke

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- execution project

    • Project decsription

Geometry: -Los A ca 480 m -Los C ca 370 m -Steel structure ca 5`000.ton
Scope of work:
Execution project (steel and reinforcement concrete structures)
Realization:
Workshops drawings of steel structure (Part A, Part C):
- formwork and reinforcement drawings for concrete roadway
- list of material; material order
- erection work organization scheme.
 


Dismantling of an old steel railway bridges, over Nysa River


2006, Bogatynia, PL
  • Investor

Brown coal-mine Turow, Bogatynia, PL

  • Architect/Employer

Brown coal-mine Turow

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- Site inspection and inventory of existing structure

    • Project decsription

Geometry: – 5 spans of land steel bridge – 1 span arch steel bridges L ca 60 m – Steel structure ca 180. ton
Scope of work:
Complete documentation of dismantling of an old steel railway bridges between Coal-mine Turów and a Electric power station in Germany (inventory, permit for disassembly, execution project)
Realization:
Site inspection and inventory of existing structure, multi-variant preliminary project, documentation for disassembly permission, execution documentation, list of Material; waste management and rehabilitation project
 


4 railway steel bridges: railway line Hauptbahnhof – Ostbahnhof


2005, Berlin, DE
  • Investor

Bilfinger Berger AG, Berlin, DE

  • Architect/Employer

Bilfinger Berger AG

  • Realization/Structure

Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- execution project (steel structures)

  • Project decsription

Geometry: – 2 steel bridges for line S-Bahn L ca 20 m – 2 steel bridges for line F-Bahn L ca 20 m – Steel structure ca 50. ton
Scope of work:
Execution project (steel structures)
Realization:
Workshops drawings of steel structure (S-Bahn, F-Bahn) -List of Material; Material order

 


Residential complex Brunnmatt-Ost ‘Fünf Freunde’


2010-2011, Bern, CH
  • Investor

Baugesellschaft Brunnmatt-Ost, p.A. Emil Merz AG, Bern

  • Architect/Employer

- ANS Architekten und Planer SIA AG, Worb
- Esch Sintzel GmbH, Architekten ETH SIA BSA, Zürich
- Ernst Basler+Pratner AG, Zürich

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH, Münchenstein

  • Project scope

- execution project

  • Project description

Apartment block in the form of comb consisting of five wings connected by the main building. The complex contains more than 100 apartments.
Scope of work:
Execution project of residential complex.
Realizacion:
Design of reinforced concrete load-bearing structure of the building – execution project. Scope of study: exchange of land, foundation slab on piles;
carrier system: load-bearing concrete walls and reinforced concrete floors, staircases, lift shafts and balconies.


Office and apartment building ‘Ruchfeld’


2008-2009
Münchenstein, CH
  • Investor

Ingenieurbüro Z.Sacharuk GmbH, Münchenstein, CH

  • Employer/Architect

Paweł Sacharuk; N + Z.Sacharuk

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- building design
- execution project
- construction supervision

  • Project description

Usable area: 140,0 m2 Building area: 70,0 m2 Cubage: 500,0 m3
Scope of work:
Project of an office and apartment building. Building permit documentation, execution project. Ground floor – office part. First floor – apartment part
Realization:
Preliminary, building permit documentation, execution project; static calculation, CAD drawings, site supervision. Building structure: ground floor – concrete structure first floor and attic – wooden structure


Apartment complex, Housing Estate ‘Gradowa’ in Wrocław


2001-2002
Wroclaw, PL
  • Investor

Housing estate co-operative ‘WOJEWODZIANKA’, Wrocław

  • Employer/Architect

Arch. Andrzej Ryś, Wrocław

  • Realization/Structure

Polswiss-Projekt Ltd., Wroclaw

  • Project scope

- building design
-execution project
- construction supervision

no photo gallery

  • Project description

Usable area: 6273,5 m2 Building area: 2613,0 m2 Cubage: 17565,8 m3
Scope of work:
Construction design, documentation for building permit, execution project, (static calculation, CAD drawings), site supervision,
Solution:
Conventional building system: reinforced concrete frame construction, brick walls of hollow bricks ,Porotherm’ – system and concrete slabs based on Filigran-deck system, wooden roof construction, roofing by ceramic tiles.

Apartment building MFH 207214


2009
Birmensdorf,CH
  • Investor

Beat Scheuble, Erlenbach

  • Employer/Architect

Fischer Architekten AG, Zürich

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project

no photo gallery

  • Project description

Four-family apartment building.
Scope of work:
Execution project of apartment building.
Realization:
Design of reinforced concrete load-bearing structure of the building – execution. Scope of study: foundation slab, underground garage, skeletal carrier system: load-bearing walls, ceilings and concrete columns.

 


Cement Plant ‘Yamaver 5′


2006-2007, Riyadh, SA
  • Investor

YAMAMA Saudi Cement Company YSCC, SA

  • Architect/Employer

Krupp Polysius AG

  • Realization/Structure

- Neu Beckum, Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- construction supervision
- quality control

  • Project description

Raw material supply system, crumble work, silos of raw materials, mill of Raw materials, rotating furnace, calcinations tower, clinker cooling system, clinker mills, clinker silos, transportation system, loading station.
Task:
Erection of the New Clinker Grinding Plant and New Clinker Production Line No. 7 with capacity of 10’000 ton per day. Consulting and supervision of the erection of concrete structures and steelwork for the extension of Cement plant YAMAVER-5 at Riyadh, Saudi Arabian.
Solution:
Assistance and advising of the Technical Manger in all matters related to the civil and structural steel work, Organisation and conducting of the necessary correspondence, Observation of construction and structural steel erection works, Clarification of discrepancies, Recording of all required modifications and indication of reasons thereof, Review of the time schedule, co-ordination of alterations and reporting cause and responsibilities for delays to POLYSIUS, Review of GAMA’s assessment and reporting of the monthly progress for civil works, structural steel deliveries and structural steel erection, Recording, assessment and reporting of any faults in POLYSIUS’s drawings and documents, Participation in technical discussions with YSCC as far as technical matters and time scheduling of the civil and structural steel engineering design and work is concerned and other duties in connection with the realisation of this project for which the Liaison Engineer has the qualification and ability.


Cement Plant ‘Eastver’


2005-2007
Khursaniyah, SA

  • Investor

Eastern Province Cement Company EPCC, SA

  • Employer/Architect

Krupp Polysius AG

  • Realization/Structure

- Neu Beckum, Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- site supervision
- quality control

  • Project description

Raw material supply system, crumble work, silos of raw materials, mill of Raw materials, rotating furnace, calcinations tower, clinker cooling system, clinker mills, clinker silos, transportation system, loading station
Task:
Erection of the New Clinker Production Line No. 3 with capacity of 3’500 ton per day. Consulting and supervision of the erection of concrete structures and steelwork for the extension of Cement plant EASTVER at Khursaniyah, Eastern Province, Saudi Arabian
Solution:
Assistance and advising of the Technical Manger in all matters related to the civil and structural steel work, Organisation and conducting of the necessary correspondence, Observation of construction and structural steel erection works, Clarification of discrepancies, Recording of all required modifications and indication of reasons thereof, Review of the time schedule, co-ordination of alterations and reporting cause and responsibilities for delays to POLYSIUS, Review of GAMA’s assessment and reporting of the monthly progress for civil works, structural steel deliveries and structural steel erection, Recording, assessment and reporting of any faults in POLYSIUS’s drawings and documents, Participation in technical discussions with EPCC as far as technical matters and time scheduling of the civil and structural steel engineering design and work is concerned and other duties in connection with the realisation of this project for which the Liaison Engineer has the qualification and ability.


Cement Plant ‘Podgrodzie’


2001-2002
Raciborowice, PL
  • Investor

„KLOESTERS” Sp. z o.o., Wroclaw, PL

  • Employer/Architect

Allmineral AG

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- tender design
- design and construction permission

  • Project description

Cement plant for 3500 t per day; documentation for building permit.
Task:
Phase 1 – Land development plan, environment protection design, raw material supply system, construction of crusher, silos for cement, cement loading station.
Solution:
Multi-branches planning and design contract (documentation for building permit): architecture, construction, roads, electrical network, hydrographical network, rain water drainage system, hitting system


Production facilities ‘Rolls Royce Marine’


2009-2010, Gniew, PL
  • Investor

Rolls Royce Marine

  • Architect/Employer

ISG Europe

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- reconstruction and expansion of production facilities
- site work execution scheme
- construction supervision

  • Project description

The modernization and expansion of the Rolls Royce Marine factory in Gniew.
Scope of work:
The modernization of the production hall, construction of a new coating workshop, adaptation and transportation system expansion of the plant.
Realizacion:
Execute project of steel, concrete and bricks structure; accompanying media projects. Exchange and strengthening the existing hall steel elements; new block foundation for machines, industrial floor, complete construction of the new coating workshop, the modernization of the facade and the illumination of coating workshop; heating and ventilation system, the necessary repair work (painting, corrosion protection, replacement of windows).


Silos Pollytag na popiol lotny V=12000 m3


2009-2010, Gdansk, PL
  • Investor

Pollytag AG, Gdansk, PL

  • Employer/Architect

Vertex AG, Siechnice, PL

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wroclaw

  • Project scope

- building design and permit
- execution project
- csite supervision

  • Project description

Rainforced concrete silo of raw materials: V=9000 m3.
Scope of work:
Building design and execution project of rainforced concrete silo.
Realization:
Conceptual design with construction details of rainforced concrete silo; backfilling system on the silo’s roof and material collection system udnder the silo.
Structural calcuations and workshop dokumentation of steel structure staircase, service platforms, roof structure


Silosy – Cementownia ‘Eastver’


2005-2007
Khursaniyah, SA
  • Investor

Eastern Province Cement Company EPCC, Dammam 31412, SA

  • Employer/Architect

Krupp Polysius AG

  • Realization/Structure

- Krupp Polysius AG, Neu Beckum
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- site supervision

  • Project description

Rainforced concrete silos of raw materials.
Scope of work:
Consulting and supervision of the erection of concrete structures.
Realization:
Assistance and advising of the Technical Manger in all matters related to the civil and structural steel work, Organisation and conducting of the necessary correspondence.
Recording, assessment and reporting of any faults in POLYSIUS’s drawings and documents.

 

Central boiler house ’Werkhof’


2008-2009, Arisdorf, CH
  • Investor

Gmina Arisdorf, CH

  • Architect/Employer

Arch. Sybille Hartmann, Arisdorf, CH

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- design and construction permission
- execution project
- site supervision

  • Project description

Boiler house using eco-friendly fuel along with hall storage for wood and wood waste.
Scope of work:
Project of central biological boiler house in Arisdorf.
Realizacion:
Building design and execution project of supporting structure of the administration-office building and a warehouse in a wooden structure. The baseplate in halls and basement of the main building, the design of reinforced concrete administration-office building. The foundation and floor slab for warehouse, warehouse wood construction with a overhead crane.