Hangar for airplane A380 ‘Wide Wide Body’


2008, Euroairport
Basel-Mulhause
  • Investor

Jet Aviation, Basel, CH

  • Architect/Employer

Losinger S.A., Basel

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project
- technical documentation
- manufacture of construction in PL
- transport and assembly in France

  • Project description

Hangar ‘Wide Wide Body’ has been developed for the assembling of the Airbus A380 for special clients and his later maintenance. It was planed to be assemble from parts procuced in different Airbus plants aroung France. The hangar main hall has dimensions A=100.0m, B=110.0m H=33.0m. The main hall is cased with srvice and office buildings.
Scope of work:
Execution project of steel structure of the main hall (Hangar is located on a seismic ground). Fabrication of the steel structer and their transport to Euroairport. Assembling of the steel structure.
Realizacion:
Execution project of steel structure included detail design, connection check and workshop drawing according to french standards. Fabrication of the steel structure has been done in Poland and in Germany. The main supporting elements and profiles has been produced from welded cross-sections produced by huta Pokoj in Poland. The steel structure include roof structure, fasades, entrence gateway, workshop crane, working platforms, fire protection cutains, passarels and stairs. Transportation by car from production plants to the Euroairport. The roof was entirely assembled on the ground slab and erected by hydraulic devices manipulate by specialists from VSL Company.
 


Industry hall for storage and production – CYNKMAL


1999-2000, Legnica, PL
  • Investor

Cynkmal Sp. z o.o., Legnica, PL

  • Architect/Employer

Cynkmal Sp. z o.o., Legnica, PL

  • Realization/Structure

Polswiss-Projekt Sp. z o.o. Wroclaw

  • Project scope

- design and construction permission
- execution project
- site supervision

  • Project description

Usable area: ca 500 m2 Building area: ca 500 m2 Cubage: ca 2000 m3
Scope of work:
Development of Hall System; Complex project of industrial building /industrial hall/, site supervision
Realizacion:
Hall supporting structure made from light gauge profiled steel sheeting, Multilayer lining inclusive windows and gates, foundation and concrete plate. New Hall system.

 


Extension of the FAEL-LEGRAND Production Plant


1998-1999
Zabkowice Sl., PL
  • Investor

FAEL-Legrand, Zabkowice Sl., PL

  • Architect/Employer

- Impresio Sp. z o.o.
- FAEL-Legrand

  • Realization/Structure

Polswiss-Projekt Sp. z o.o., Wrocław

  • Project scope

- execution project
- building design
- construction supervision

  • Project description

Usable area: 8500,0 m2 Building area: 7500,0 m2 Cubage: 80000,0 m3
Scope of work:
Multistorage werehouse hall for electrical materials, roads & places, water pump station and accompanying infrastructure. Technicl documentation contained: architecture, structure, air condition, sanitary and electrical installations, fire protection.
Realizacion:
Planning & design stages:
- technical doc. for building permission
- execution project
- coordination & selection of subcontractors for building , roads and squeres design and for execution works.