PROJEKTY W BUDOWNICTWIE

Flour production plants, mill buildings: Batiment-1 and Batiment-2, Sonoco Conakry


2012-2013, Conakry, GN
  • Investor

Batco Conakry, Gwinea

  • Architect/Employer

Batco Engineering Conakry

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description:

Three-piece mill buildings: Batiment-1 and Batiment-2 for flour production plants: Sonoco Conakry.
Scope of work:
Project and construction of the mill buildings: Batiment-1 and Batiment-2 in a steel structure.
Realizacion:
Conceptual-technology project of the mill buildings: Batiment-1 and Batiment-2; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, project and fabrication of the facade and roof, and transport to Conakry, montage of facades and roof.

 


Extension of Batco factories – Atelier des armatures


2012-2013, Conakry, GN
  • Investor

Batco Conakry, Gwinea

  • Architect/Employer

Batco Engineering Conakry, BMS Entzheim, F

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- building design
- execution project
- technical documentation
- manufacture of construction in PL
- assembly in Gwinea

  • Project description

The production hall of structural elements for the company Batco, Conakry.
Scope of work:
Project and construction of a production hall – ‘Atelier des armatures’ in a steel structure.
Realizacion:
Conceptual-technology project of the production hall building; execution project, workshop documentation; supervision of fabrication; steel structure transport to Conakry; assembly with final acceptances, project and fabrication of the facade and roof, and transport to Conakry, montage of facades and roof.


Production facilities ‘Rolls Royce Marine’


2009-2010, Gniew, PL
  • Investor

Rolls Royce Marine

  • Architect/Employer

ISG Europe

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow

  • Project scope

- reconstruction and expansion of production facilities
- site work execution scheme
- construction supervision

  • Project description

The modernization and expansion of the Rolls Royce Marine factory in Gniew.
Scope of work:
The modernization of the production hall, construction of a new coating workshop, adaptation and transportation system expansion of the plant.
Realizacion:
Execute project of steel, concrete and bricks structure; accompanying media projects. Exchange and strengthening the existing hall steel elements; new block foundation for machines, industrial floor, complete construction of the new coating workshop, the modernization of the facade and the illumination of coating workshop; heating and ventilation system, the necessary repair work (painting, corrosion protection, replacement of windows).


Production facilities ‘COLEX-Clariant Sp z o.o’


2008-2010, Zgierz, PL
  • Investor

Clariant AG

  • Architect/Employer

COLEX-Clariant Sp z o.o

  • Realization/Structure

Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- conceptual design
- design and construction permission
- execution project

  • Project description

Expansion of existing pigments production facilities: COLEX-Clariant Ltd. in Zgierz.
Scope of work:
Production facilities expansion project of a new production hall, high storage warehouse, industrial laboratories. Extension of the social -office building. The scope of the task: the general designer.
Realizacion:
Inventory of existing facilities and land for development. Multiple (architecture, construction, sanitary, electrical, HVAC, squares and roads) plant expansion project. Design and construction permission; tender design with cost estimates and the organization of the tender for construction.


Production facilities B926 i B935 – ‘Clariant Factory’


2008-2009, Muttenz, CH
  • Investor

Clariant AG, Muttenz, CH

  • Architect/Employer

Clariant AG, Muttenz, CH

  • Realization/Structure

- Ingenieurbüro Z.Sacharuk GmbH
- Ernst Basler+Partner AG, Zürich
- Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- static and dynamic analysis
- verification of strength in case of earthquake

  • Project description

Clariant chemical plants – the modernization and strengthening of B926 and B935 production buildings.
Scope of work:
Inventory contents and structure of the B926 and B935 production buildings . The proposal of the strengthening with the necessary investment costs.
Realizacion:
Detailed inventory of tanks, machinery and building bearing structures; pointing out the load scheme of the buildings in case of earthquake; static and dynamic analysis of the existing structure of the building; strengthening project of existing structures; investment costs of strengthening; presentation of results to the board of Clariant.


Production plant for pipe and pipe fitting elements of plastic, FUNKE Polska Ltd


1999-2000
Kondratowice, PL
  • Investor

Funke Polska Sp. z o.o.

  • Architect/Employer

- Impresio Sp. z o.o.
- Funke Polska Sp. z o.o.

  • Realization/Structure

Polswiss-Projekt Sp. Z o.o., Wroclaw

  • Project scope

- general designer
- construction supervision

  • Project description

Usable area: 3500,0 m2 Building area: 3000,0 m2 Cubage: 20000,0 m3
Scope of work:
Erection of a new factory for plastic pipe and pipe fitting elements including: production hall, administration building, storage hall, transforming station, silos, roads, parking, storage areas, water reservoir
Solution:
Complete, multi branch planning, design and erection of production plant. Branch projects: disassembling project for existing buildings, architecture, structure, air condition, sanitary and electrical installations, hitting system, environmental protection structures and measures, concrete roads, parking and storage areas and permission of utilization