Cement Plant ‘Podgrodzie’

2001-2002
Raciborowice, PL
- Investor
„KLOESTERS” Sp. z o.o., Wroclaw, PL
- Employer/Architect
Allmineral AG
- Realization/Structure
- Ingenieurbüro Z.Sacharuk GmbH
- Polswiss-Projekt Sp. z o.o., Wroclaw
- Polswiss-Engineering Sp. z o.o., Krakow
- Project scope
- tender design
- design and construction permission
- Project description
Cement plant for 3500 t per day; documentation for building permit.
Task:
Phase 1 – Land development plan, environment protection design, raw material supply system, construction of crusher, silos for cement, cement loading station.
Solution:
Multi-branches planning and design contract (documentation for building permit): architecture, construction, roads, electrical network, hydrographical network, rain water drainage system, hitting system
Building B-4, Department of Mechanical Engineering and Management – University of Technology

2000, Wroclaw, PL
- Investor
University of Technology, Wroclaw
- Employer/Architect
Universiti of Technology of Wroclaw
- Realization/Structure
- Polswiss-Projekt Sp. z o.o., Wroclaw (general designer)
- Polswiss-Engineering Sp. z o.o., Kraków
- Ingenieurbüro Z.Sacharuk GmbH, Münchenstein
- Project scope
- competition project with architectural office WW-Projekt (first place)
- building design
- execution project
- construction supervision
- Project description
Usable area: 1 2000m2; Building area: 3 500m2 Cubage: 50 000m3
Scope of work:
Construction of a new Building B-4 including: lecture, conference and computer rooms, library, professor and university teacher rooms, laboratories, cafeteria, restaurants, cloakrooms, underground parking, storage rooms, foyer, porter’s lodge, lifts, stairs, showrooms, etc. 1-Award in architecture competition containing: Building and engineering design.
Realization:
Complete 2-stage project (Building permission and complete execution project) including architecture, structure, air condition, sanitary & electric installations, power engineering, central heating, wiring system, house drainage, roads and squares etc., and site supervision. Cost estimation, selection of contractor, technical acceptance, quality control and work supervision.
Production plant for pipe and pipe fitting elements of plastic, FUNKE Polska Ltd
- Project description
Usable area: 3500,0 m2 Building area: 3000,0 m2 Cubage: 20000,0 m3
Scope of work:
Erection of a new factory for plastic pipe and pipe fitting elements including: production hall, administration building, storage hall, transforming station, silos, roads, parking, storage areas, water reservoir
Solution:
Complete, multi branch planning, design and erection of production plant. Branch projects: disassembling project for existing buildings, architecture, structure, air condition, sanitary and electrical installations, hitting system, environmental protection structures and measures, concrete roads, parking and storage areas and permission of utilization