Cable stayed bridge for highway A281
- Project decsription
Geometry: -Los A ca 480 m -Los C ca 370 m -Steel structure ca 5`000.ton
Scope of work:
Execution project (steel and reinforcement concrete structures)
Realization:
Workshops drawings of steel structure (Part A, Part C):
- formwork and reinforcement drawings for concrete roadway
- list of material; material order
- erection work organization scheme.
Dismantling of an old steel railway bridges, over Nysa River
- Project decsription
Geometry: – 5 spans of land steel bridge – 1 span arch steel bridges L ca 60 m – Steel structure ca 180. ton
Scope of work:
Complete documentation of dismantling of an old steel railway bridges between Coal-mine Turów and a Electric power station in Germany (inventory, permit for disassembly, execution project)
Realization:
Site inspection and inventory of existing structure, multi-variant preliminary project, documentation for disassembly permission, execution documentation, list of Material; waste management and rehabilitation project
4 railway steel bridges: railway line Hauptbahnhof – Ostbahnhof
- Project decsription
Geometry: – 2 steel bridges for line S-Bahn L ca 20 m – 2 steel bridges for line F-Bahn L ca 20 m – Steel structure ca 50. ton
Scope of work:
Execution project (steel structures)
Realization:
Workshops drawings of steel structure (S-Bahn, F-Bahn) -List of Material; Material order