PROJEKTY W BUDOWNICTWIE
Annual Archive
Categories


2008, Euroairport
Basel-Mulhause
  • Investor

Jet Aviation, Basel, CH

  • Architect/Employer

Losinger S.A., Basel

  • Realization/Structure

- Polswiss-Projekt Sp. z o.o., Wroclaw
- Ingenieurbüro Z.Sacharuk GmbH

  • Project scope

- execution project
- technical documentation
- manufacture of construction in PL
- transport and assembly in France

  • Project description

Hangar ‘Wide Wide Body’ has been developed for the assembling of the Airbus A380 for special clients and his later maintenance. It was planed to be assemble from parts procuced in different Airbus plants aroung France. The hangar main hall has dimensions A=100.0m, B=110.0m H=33.0m. The main hall is cased with srvice and office buildings.
Scope of work:
Execution project of steel structure of the main hall (Hangar is located on a seismic ground). Fabrication of the steel structer and their transport to Euroairport. Assembling of the steel structure.
Realizacion:
Execution project of steel structure included detail design, connection check and workshop drawing according to french standards. Fabrication of the steel structure has been done in Poland and in Germany. The main supporting elements and profiles has been produced from welded cross-sections produced by huta Pokoj in Poland. The steel structure include roof structure, fasades, entrence gateway, workshop crane, working platforms, fire protection cutains, passarels and stairs. Transportation by car from production plants to the Euroairport. The roof was entirely assembled on the ground slab and erected by hydraulic devices manipulate by specialists from VSL Company.