- Project decsription
Geometry: -Los A ca 480 m -Los C ca 370 m -Steel structure ca 5`000.ton
Scope of work:
Execution project (steel and reinforcement concrete structures)
Realization:
Workshops drawings of steel structure (Part A, Part C):
- formwork and reinforcement drawings for concrete roadway
- list of material; material order
- erection work organization scheme.